Recent projects · Birmingham

See the work
take shape.

A finished bathroom tells only half the story. Follow our work from the first strip-out and hidden plumbing through to the final finish.

01Strip-out

Back to the structure

The old bathroom was carefully stripped back, giving clear access to the room and allowing the new layout to be prepared properly.

Bathroom stripped back to the wall framing during renovation
Strip-out · Birmingham bathroom renovation
02First fix

Plumbing built to last

New copper pipework and concealed shower controls were installed within the wall before it was closed, waterproofed and tiled.

New copper shower pipework installed inside timber wall framing
First fix · Birmingham bathroom renovation
03Installation

The room takes shape

Large-format tiles, twin niches and brushed-brass shower fittings brought the design together while the final details were completed.

Tiled shower wall with brass shower fittings during installation
Installation · Birmingham bathroom renovation
04The finish

Calm, warm and complete

A fully finished bathroom with coordinated brass details, practical storage and a clean, understated palette.

Completed beige bathroom with brass shower enclosure, vanity and toilet
The finish · Birmingham bathroom renovation

Project 02 · Full transformation

From stripped back
to fresh and bright.

A compact family bathroom rebuilt around a full-sized bath, overhead shower and practical storage, finished in pale grey stone-effect tile.

01Strip-out

A complete reset

The room was stripped back to reveal the original walls, floor and services, ready for the new bathroom to be built properly.

Small bathroom stripped back before renovation
Strip-out · Birmingham bathroom renovation
02Preparation

Protected before tiling

The bath was set in position and the surrounding wet area was prepared with waterproof backer boards before the new tiles went on.

Bath installed with waterproof backer boards during renovation
Preparation · Birmingham bathroom renovation
03Tiling & fitting

The new room emerges

Grey stone-effect tiles were laid across the walls and floor before the toilet, vanity and bath fittings were carefully installed.

Grey tiled bathroom with toilet, vanity and bath being fitted
Tiling & fitting · Birmingham bathroom renovation
04The finish

Bright, clean and practical

The completed room makes excellent use of its compact footprint, with a full bath, overhead shower, useful vanity storage and a crisp finish.

Completed grey and white bathroom with toilet, vanity and bath
The finish · Birmingham bathroom renovation

Your bathroom could be next

Ready to begin
your transformation?

Request a free quote