Back to the structure
The old bathroom was carefully stripped back, giving clear access to the room and allowing the new layout to be prepared properly.

Recent projects · Birmingham
A finished bathroom tells only half the story. Follow our work from the first strip-out and hidden plumbing through to the final finish.
The old bathroom was carefully stripped back, giving clear access to the room and allowing the new layout to be prepared properly.

New copper pipework and concealed shower controls were installed within the wall before it was closed, waterproofed and tiled.

Large-format tiles, twin niches and brushed-brass shower fittings brought the design together while the final details were completed.

A fully finished bathroom with coordinated brass details, practical storage and a clean, understated palette.

Finished details





Project 02 · Full transformation
A compact family bathroom rebuilt around a full-sized bath, overhead shower and practical storage, finished in pale grey stone-effect tile.
The room was stripped back to reveal the original walls, floor and services, ready for the new bathroom to be built properly.

The bath was set in position and the surrounding wet area was prepared with waterproof backer boards before the new tiles went on.

Grey stone-effect tiles were laid across the walls and floor before the toilet, vanity and bath fittings were carefully installed.

The completed room makes excellent use of its compact footprint, with a full bath, overhead shower, useful vanity storage and a crisp finish.

Completed bathroom


Finished bathrooms
A selection of recently completed spaces, from compact family bathrooms to walk-in showers and carefully finished details.










Your bathroom could be next